The green has been removed and the undersurface
stabilised. It is hard to believe that the Australian Open finals were
played on the space last February.
|

Some of the pillars which will support the roof have been
installed.
|

|

|

Supports for the roof extension to house the plaza, toilets and bar are
in place.
|

Preparing for the slab on the building extension.
|
|
|
|
|

The steel work on the western end of the green is starting to take
shape.
|

The extensions are taking shape. The extended bar, a storeroom and
toilet are being set up.
|

The steel for the roof has been laid out on the green like a giant meccano
set.
|
|
|

Two very large cranes lift the assembled sections into place.
|

The size of the structure becomes apparent when comparing the size of
the workmen.
|

The clubhouse end.
|

Insulation on the western end. Skylights can be seen.
|

As seen from above.
|

Looking from the north end of the Members Green. The span of the roof
covers 47metres.
|

All the roofing is on, and the framing for the facia is being fitted.
|

The walkway had to be dug up to connect the sewerage.
|
|
|
|
|
|